top of page
  • Writer's pictureCBS Concreting

Repton School, Derby


Project Specification

Concrete Pour Size 1,478 ㎡

Tolerance achieved SR3

Concrete Laid per day 120 ㎥


Our team installed ground & upper floor concrete slabs at Repton School, Derby, another project for our repeat Client Davlyn Construction with a total area of 1,478 m².


We laid 240 m³ of concrete to SR3 with a powerfloat finish.


We laid under slab insulation and perimeter insulation.


Also, we carried out saw-cut and isolation joints


“CBS Concreting installed upper floors & ground floor slabs for Repton School in Derby, a total area of 1,478 ㎡ with an excellent Powerfloat finish"

Project Summary